info@challengebuildingservices.co.uk
Home
About
Case Studies
Fabrication
Low Loss Headers
Steel Pipework
Other Steelworks
Copper Headers
Conversion Spools
Arc welded imperial flanges to metric
Arc welded metric conversion spools
Arc welded reducing conversion spools
Finishes
Painted Finish
Powder Coated Finish
Galvanised Finish
Installations
Install New Equipment and Services
Strip Out and Remove Redundant Services
Install Pipework and Equipment to Existing Services
Cleaning Services
Gallery
Contact
Case Studies
Copper Headers
Pipework Fabrication
Energy Centre, South Thamesmead, London, 2026
Case Study
Fabrication, Modification & Installation Project, Woolwich, 2025
Case Study
Energy Centre, South East London, 2025
Case Study
Boiler Replacement, Winchester, 2024
Case Study
Repairing a leak on condenser pipework, Winchester, 2024
Case Study
Chiller Project Fabrication, Fareham, 2024
Pipework Fabrication
6″ Pipework Fabrication, Fareham, 2024
Pipework Fabrication
Condenser Water System to Cooling Towers, Winchester, 2024
Case Study
Chilled Water Pump Replacement, Winchester, 2023
Case Study
Denco Units Replacement & New AHU Installation, Southampton, 2023
Case Study
Indoor Climate System, Kettering, 2023
Case Study
Boiler Change & AHU Replacement, Southampton, 2022
Case Study
Chiller Change & AHU Refurbishment, Southampton, 2021
Case Study
Energy Centre, East Ham, London, 2021
Case Study
Energy Centre, Hackbridge, London, 2019
Case Study
G Block 3 Port Valves, Winchester, 2018
Case Study
C Block Calorifier Replacement, Winchester, 2018
Case Study
G Block Boiler Replacement, Winchester, 2018
Case Study
Boiler House, South London, 2016
Case Study
Booster Set Replacement, Winchester, 2011
Case Study
Menu