info@challengebuildingservices.co.uk
Home
About
Case Studies
Fabrication
Low Loss Headers
Steel Pipework
Other Steelworks
Copper Headers
Conversion Spools
Arc welded imperial flanges to metric
Arc welded metric conversion spools
Arc welded reducing conversion spools
Finishes
Painted Finish
Powder Coated Finish
Galvanised Finish
Installations
Install New Equipment and Services
Strip Out and Remove Redundant Services
Install Pipework and Equipment to Existing Services
Cleaning Services
Gallery
Contact
Case Studies
Repairing a leak on condenser pipework for a client
Case Study
Indoor Climate System Kettering
Case Study
Chiller project fabrication recently completed for a client
Pipework Fabrication
6″ Pipework fabrication recently completed for a client
Pipework Fabrication
East Ham London Energy Centre
Case Study
Chilled Water Pump Replacement
Case Study
Winchester Condenser Water System to Cooling Towers
Case Study
Booster Set Replacement
Case Study
Southampton Denco units strip out and new AHU installation
Case Study
Southampton Boiler Change & AHU Replacement
Case Study
Southampton Chiller Change & AHU Refurbishment
Case Study
Energy Centre Hackbridge London
Case Study
Winchester G Block 3 Port Valves
Case Study
Winchester C Block Calorifier Replacement
Case Study
G Block Boiler Replacement
Case Study
South London Boiler House
Case Study
Menu