6″ Pipework fabrication recently completed for a client

Year of Completion 2024

LinkedIn
Instagram

We received an enquiry to quote for fabrication of a 6″ section with bends and branches.

We won the tender and our qualified welders carried out the arc welding to Class 2, with the required plate flanges.

Once the fabrication was complete, the section was painted with red oxide paint and loaded onto our flatbed truck at our Fareham facility ready for delivery direct to the client in Portsmouth.

Recent Case Studies

We received an enquiry to quote for fabrication of a 6″ section with bends and branches.

We won the tender and our qualified welders carried out the arc welding to Class 2, with the required plate flanges.

Once the fabrication was complete, the section was painted with red oxide paint and loaded onto our flatbed truck at our Fareham facility ready for delivery direct to the client in Portsmouth.