Chiller project fabrication recently completed for a client

Year of Completion 2024

LinkedIn
Instagram

We were asked by our client to fabricate some red heavy pipework to their own design for their chiller project.

Our fully qualified welders arc welded 6″ and 4″ pipe sections with the required branches and plate flanges, following the dimensions provided by the client.

The completed work was then painted with 2 coats of red oxide paint and set aside ready for us to deliver to their site in Southampton.

 

 

Recent Case Studies

We were asked by our client to fabricate some red heavy pipework to their own design for their chiller project.

Our fully qualified welders arc welded 6″ and 4″ pipe sections with the required branches and plate flanges, following the dimensions provided by the client.

The completed work was then painted with 2 coats of red oxide paint and set aside ready for us to deliver to their site in Southampton.